Get Adobe Flash player

SOUTH PARS OIL LAYER PROJECT

Installation Engineering Works

The South Pars Oil Field is located in the center of Persian Gulf on the Qatar-Fars high, about 100 km from Iranian coast, and adjacent to the international boundary with Qatar. The South Pars Oil Layer is to be developed as part of a phased development program.

PETROIRAN Co. (COMPANY) & SAFF Co. (CONTRACTOR) singed an EPCI contract for carrying out Engineering, Procurement, Construction and Installation of offshore structures. For Phase I, one new production and water injection (future) Wellhead Platform will be installed.

After construction of the structures, Jamm has been awarded a subcontract to carry out the installation engineering activities. This includes preparation of all procedures, calculation reports and drawings for transportation and installation of jacket, piles, decks and appurtenances.